| |
TM 5-2420-222-20-2
LOADER CONTROL BOX DOOR - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
6.
All attaching
Look for damaged threads.
hardware
INSTALLATION
7. Loader control
Door (2)
Place in position.
box (1)
8. Loader control box
Seven screws (3)
Screw in and tighten using 1/4-inch
(1) and door (2)
flat-tip screwdriver.
TASK ENDS HERE
2-1169
|