TM 5-2420-222-20-2
LOADER CONTROL BOX
This task covers:
a.
Removal (page 2-1170)
e.
Repair (page 2-1175)
b.
Disassembly (page 2-1174)
f.
Assembly (page 2-1175)
c.
Cleaning (page 2-1174)
g.
Installation (page 2-1176)
d.
Inspection/Replacement (page 2-1174)
INITIAL SETUP:
Tools
Materials/Parts - Continued
Handle, ratchet, 3/8-inch drive
Rags, wiping (item 21, Appendix C)
Pliers, slip-joint
Solvent, drycleaning (item 28, Appendix C)
Socket, 3/8-inch drive, 9/16-inch
Wrench, box, 9/16-inch
Personnel Required
Wrench, open-end, 7/16-inch
Wrench, open-end, 15/16-inch
Two
Wrench, open-end, 11/8-inch
Equipment Condition
Materials/Parts
1.
Battery ground cable disconnected
Detergent, GP (item 7, Appendix C)
(page 2-696)
Lockwasher, control box
2.
Loader control box door removed
(two required)
(page 2-1167)
Lockwasher, control box screw
(five required)
Lockwasher, pivot control screw
(two required)
Lockwasher, throttle lever screw
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1. Handle (1) and
Nut (3)
Using 15/16-inch open-end wrench,
handle mount (2)
loosen.
2. Handle mount (2)
Handle (1)
a.
Note position for proper placement
during installation.
b.
Unscrew and take out.
3. Control box (4) and
Two screws (6)
a.
Using 9/16-inch box wrench, unscrew
control pivot (5)
and lockwashers (7)
and take out.
b.
Get rid of lockwashers (7).
2-1170
|