|
|
TM 5-2420-222-20-1
THERMOSTAT
This task covers:
a. Removal (page 2-396)
d.
Testing (page 2-398)
b. Cleaning (page 2-397)
e.
Installation (page 2-398)
c. Inspection/Replacement (page 2-397)
INITIAL SETUP:
Tools
Materials/Parts
Handle, ratchet, 3/8-inch drive
Gasket, thermostat cover
Heating equipment
Rags, wiping (item 21, Appendix C)
Screwdriver, flat-tip, 3/16-inch
Socket, 3/8-inch drive, 9/16-inch
Personnel Required
Thermometer
Wrench, torque, 3/18-inch drive,
One
0 to 60 N.m capacity
Equipment Condition
1. Hood removed (page 2-1025)
2. Radiator drained (page 2-368)
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1. Upper radiator
Clamp (2)
Using 3116-inch flat-tip screwdriver,
hose (1)
loosen.
2. Cover (3)
Upper radiator
Pull off.
hose (1) with
assembled clamp (2)
3. Cover (3), clamp
Two screws (6)
Using 9/16-inch, 3/8-inch drive socket
(4), and thermostat
and ratchet handle, unscrew and take out.
housing (5)
4. Cover (3) and
Clamp (4)
Take off.
Injection leakoff
fuel tube (7)
5. Thermostat
Cover (3) and
a. Take off.
housing (5)
gasket (8)
b. Get rid of gasket (8).
6.
Thermostat (9)
Take out.
2-396
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |