| ||||||||||
| 
 
  | 
![]() TM 5-2420-222-20-1 
RADIATOR - CONTINUED 
ACTION 
LOCATION 
ITEM 
REMARKS 
INSTALLATION - CONTINUED 
74. 
Loader backhoe 
Engine 
If not already off, shut down 
 (TM 5-2420-222-10). 
NOTE 
FOLLOW-ON MAINTENANCE: Install right side grille (page  TM 5-2420-222-10). 
TASK ENDS HERE 
RADIATOR STRIPS 
This task covers: 
a. Cleaning (page 2-386) 
c. Removal (page 2-388) 
b. Inspection/Replacement 
d.  Installation (page 2-388) 
(page 2-387) 
INITIAL SETUP 
Materials/Parts 
Personnel Required 
Adhesive, metal bonding 
One 
(item 1, Appendix C) 
Detergent, GP (item 7, Appendix C) 
Equipment Condition 
Solvent, cleaning compound 
(item 27, Appendix C) 
Left side grille removed  (TM 5-2420-222-10) 
ACTION 
LOCATION 
ITEM 
REMARKS 
NOTE 
There are four radiator packing strips which are maintained the same way. One is shown. Repeat 
procedures for others as needed. 
CLEANING 
NOTE 
For more information on how to clean parts, go to General Maintenance Instructions (page 2-137). 
2-386 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |