| ||||||||||
| 
 
  | 
![]() TM 5-2420-222-20-1 
FUEL INJECTION TUBES 
This task covers: 
a. Removal (page 2-214) 
c. 
Inspection/Replacement (page 2-217) 
b. Cleaning (page 2-216) 
d. 
Installation (page 2-217) 
INITIAL SETUP 
Tools 
Materials/Parts 
Adapter, socket wrench, 
Detergent, GP (item 7, Appendix C) 
1/2-inch female to 318-inch male 
Lockwasher, strap screw (three required) 
Crowfoot attachment, socket wrench, 
Protective cap (four required) 
open-end, 3/18-inch drive, 9/16-inch 
Rags, wiping (item 21, Appendix C) 
Extension, 3/8-inch drive, 5-inch 
Solvent, drycleaning (item 28, Appendix C) 
Handle, ratchet, 3/8-inch drive 
Washer, special (eight required) 
Socket, 3/8-inch drive, 9/16-inch 
Wrench, box, 9/16-inch 
Personnel Required 
Wrench, open-end, 5/16-inch 
Wrench, open-end, 1/2-inch 
One 
Wrench, open-end, 9/16-inch 
Wrench, open-end, 3/4-inch 
Equipment Condition 
Wrench, torque, 1/2-inch drive, 
0 to 150 foot-pounds 
1. Hood removed (page 2-1025) 
2. Battery ground cable disconnected 
(page 2-696) 
2-213 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |