| ||||||||||
| 
 
  | 
![]() TM 5-2420-222-20-1 
CLUTCH PEDAL LINKAGE 
This task covers: 
a. Removal (page 2-183) 
e. 
Repair (page 2-190) 
b  Disassembly (page 2-188) 
f 
Assembly (page 2-190) 
b. Cleaning (page 2-184) 
g. 
Installation (page 2-184) 
c. Inspection/Replacement (page 2-190) 
h. 
Adjustment (page 2-192) 
INITIAL SETUP: 
Tools 
Materials/Parts 
Caps, vise jaw (pair) 
Pin, cotter, pedal pin 
Hammer, ball-peen, 2-pound head 
Pin, cotter, rod (two required) 
Pliers, slip-joint 
Pin, cotter, rod pin 
Punch, drive-pin, straight, 1/8-inch 
Pin, cotter, rod end pin 
Punch, drive-pin, straight, 5/32-inch 
Rags, wiping (item 21, Appendix C) 
Rule, steel, machinist's, 6-inch 
Solvent, drycleaning (item 28, Appendix C) 
Threading set, screw 
Vise, machinist's 
Personnel Required 
Wrench, adjustable, 
0 to 1, 322-inch 
Two 
Wrench, open-end, 9116-inch 
Equipment Condition 
Battery ground cable disconnected 
(page 2-696) 
ACTION 
LOCATION 
ITEM 
REMARKS 
REMOVAL 
1. 
Loader backhoe 
Center platform 
Remove (page 2-1002). 
2. 
Pin (1) 
Cotter pin (2) 
a. Using slip-joint pliers, straighten 
ends and take out. 
b. Get rid of. 
3. 
Pedal (3) and 
Pin (1) 
Pull out. 
rod end (4) 
4. 
Pedal (3) 
Rod end (4) 
Take off. 
5. 
Rod (5) 
Two cotter pins 
a. Using slip-joint pliers, straighten 
(6 and 7) 
ends and take out. 
b. Get rid of. 
2-186 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |