|
|
TM 5-2420-222-20-1
CLUTCH PEDAL LINKAGE
This task covers:
a. Removal (page 2-183)
e.
Repair (page 2-190)
b Disassembly (page 2-188)
f
Assembly (page 2-190)
b. Cleaning (page 2-184)
g.
Installation (page 2-184)
c. Inspection/Replacement (page 2-190)
h.
Adjustment (page 2-192)
INITIAL SETUP:
Tools
Materials/Parts
Caps, vise jaw (pair)
Pin, cotter, pedal pin
Hammer, ball-peen, 2-pound head
Pin, cotter, rod (two required)
Pliers, slip-joint
Pin, cotter, rod pin
Punch, drive-pin, straight, 1/8-inch
Pin, cotter, rod end pin
Punch, drive-pin, straight, 5/32-inch
Rags, wiping (item 21, Appendix C)
Rule, steel, machinist's, 6-inch
Solvent, drycleaning (item 28, Appendix C)
Threading set, screw
Vise, machinist's
Personnel Required
Wrench, adjustable,
0 to 1, 322-inch
Two
Wrench, open-end, 9116-inch
Equipment Condition
Battery ground cable disconnected
(page 2-696)
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1.
Loader backhoe
Center platform
Remove (page 2-1002).
2.
Pin (1)
Cotter pin (2)
a. Using slip-joint pliers, straighten
ends and take out.
b. Get rid of.
3.
Pedal (3) and
Pin (1)
Pull out.
rod end (4)
4.
Pedal (3)
Rod end (4)
Take off.
5.
Rod (5)
Two cotter pins
a. Using slip-joint pliers, straighten
(6 and 7)
ends and take out.
b. Get rid of.
2-186
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |