|
|
TM 5-2420-222-20-1
CLUTCH PEDAL LINKAGE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
35.
Shaft (1) and
Spring pin (3)
a. Aline pin holes in shafts (1 and 2).
shaft (2)
b. Using 2-pound head ball-peen hammer,
tap in.
36.
Shaft (2) and
Spring pin (5)
a. Aline pin holes in shaft (2) and bell-
bellcrank (4)
crank (4).
b. Using 2-pound head ball-peen hammer,
tap in.
37.
Rod (6) and
Washer (8)
Slide on.
lever (7)
38.
Rod (6)
Two new cotter
a. Push in.
pins (9 and 10)
b. Using slip-joint pliers, bend ends back.
39.
Pedal (11)
Rod end (12)
Place in position.
40.
Pedal (11) and
Pin (13)
Slide in.
rod end (12)
41.
Pin (13)
New cotter pin (14)
a. Push in.
b. Using slip-joint pliers, bend ends back.
42.
Cab
Center platform
Install (page 2-1002).
ADJUSTMENT
43.
Pedal (11)
Stop (15)
a. Place in down position.
b. Depress pedal (11) by hand until heavy
resistance is felt.
Thrust ball bearing is now in contact
with clutch levers.
c. Using 6-inch machinist's steel rule,
measure clearance between stop (15)
and center platform (16).
Clearance must not be more than
314-inch (19 mm).
NOTE
If adjustment is correct, skip steps 44 thru 54.
2-192
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |