| ||||||||||
| 
 
  | 
![]() TM 5-2420-222-20-1 
CLUTCH PEDAL LINKAGE - CONTINUED 
ACTION 
LOCATION 
ITEM 
REMARKS 
INSTALLATION - CONTINUED 
35. 
Shaft (1) and 
Spring pin (3) 
a. Aline pin holes in shafts (1 and 2). 
shaft (2) 
b. Using 2-pound head ball-peen hammer, 
tap in. 
36. 
Shaft (2) and 
Spring pin (5) 
a. Aline pin holes in shaft (2) and bell- 
bellcrank (4) 
crank (4). 
b. Using 2-pound head ball-peen hammer, 
tap in. 
37. 
Rod (6) and 
Washer (8) 
Slide on. 
lever (7) 
38. 
Rod (6) 
Two new cotter 
a. Push in. 
pins (9 and 10) 
b. Using slip-joint pliers, bend ends back. 
39. 
Pedal (11) 
Rod end (12) 
Place in position. 
40. 
Pedal (11) and 
Pin (13) 
Slide in. 
rod end (12) 
41. 
Pin (13) 
New cotter pin (14) 
a. Push in. 
b. Using slip-joint pliers, bend ends back. 
42. 
Cab 
Center platform 
Install (page 2-1002). 
ADJUSTMENT 
43. 
Pedal (11) 
Stop (15) 
a. Place in down position. 
b. Depress pedal (11) by hand until heavy 
resistance is felt. 
Thrust ball bearing is now in contact 
with clutch levers. 
c.  Using 6-inch machinist's steel rule, 
measure clearance between stop (15) 
and center platform (16). 
Clearance must not be more than 
314-inch (19 mm). 
NOTE 
If adjustment is correct, skip steps 44 thru 54. 
2-192 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |