|
|
TM 5-2410-237-23
STEERING CLUTCH LEVERS AND LINKAGE MAINTENANCE - CONTINUED
0148 00
INSTALLATION - CONTINUED
17.
Adjust linkage (WP 0147 00).
5
1, 2, 3
18.
Install cover (4) on top of dash assembly (5) with four
capscrews (1), new lockwashers (2) and washers (3).
19.
Install floor plates (WP 0171 00).
20.
Connect battery cables (WP 0101 00).
4
21.
Test drive and check steering for proper operation
(TM 5-2410-237-10).
END OF WORK PACKAGE
387-045
0148 00-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |