Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
TRACK DRIVE SPROCKET/HUB REPLACEMENT - CONTINUED
0141 00
INSTALLATION - CONTINUED
31.
Install nut (7) on sprocket shaft (8). Tighten nut to 1100-1200 lb-ft (1492-1627 Nm).
32.
Tighten adjusting nut (18) until snug. Final tightening will occur during adjustment.
33.
Install retainer (6) over nut (7) on sprocket shaft (8). Do NOT install new gasket (4) or plate (3) at this time. These com-
ponents need to be removed to perform bearing adjustment.
34.
Adjust final drive bearings (WP 0128 00).
35.
Install track roller frame (WP 0135 00).
36.
Fill final drive (WP 0124 00).
37.
Connect track (WP 0143 00).
38.
Test drive and check track for proper operation (TM 5-2410-237-10).
8
11
12
5
4
9 10
76
3
12
18
17
387-659
END OF WORK PACKAGE
0141 00-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business