|
|
TM 5-2410-237-23
TRACK CARRIER ROLLERS REPLACEMENT - CONTINUED
0137 00
INSTALLATION - CONTINUED
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may result in death or injury to
personnel.
NOTE
Carrier roller assembly weighs 120 lb (55 kg).
1.
Fasten a nylon sling and a suitable lifting device and position carrier roller (1) and bracket (2) as a unit on track roller
frame (5).
2.
Secure bracket (2) to track roller frame (5) with four new lockwashers (4) and capscrews (3).
3.
Use a block and hydraulic jack and lower track into carrier roller (1).
4.
Adjust track (WP 0132 00).
5.
Test drive and check track for proper operation (TM 5-2410-237-10).
END OF WORK PACKAGE
0137 00-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |