|
|
TM 5-2410-237-23
TRACK CARRIER ROLLERS REPLACEMENT - CONTINUED
0137 00
REMOVAL - CONTINUED
1.
Place a wood block and hydraulic jack under track,
1
near carrier roller (1) and lift track up and away from
carrier roller.
2.
Fasten a nylon sling and suitable lifting device to car-
rier roller (1) and bracket (2).
3.
Remove four capscrews (3) and lockwashers (4) that
secure bracket (2) to track roller frame (5). Discard
lockwashers.
4.
Remove carrier roller (1) and bracket (2) as a unit
from track roller frame (5).
387-584
NOTE
Secure bracket in vise to permit removal of capscrews.
5.
Remove two capscrews (6) and lockwashers (7). Discard lockwashers.
6.
Separate bracket (2) from carrier roller (1).
1
1
6
7
2
387-584
2
3,4 5
387-593
INSTALLATION
NOTE
Secure bracket in vise to permit installation of carrier roller to bracket.
Apply antiseize compound to all capscrews before installation.
1.
Install carrier roller (1) on bracket (2).
2.
Install two new lockwashers (7) and capscrews (6).
0137 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |