TM 5-2410-237-23
TROUBLESHOOTING PROCEDURES - CONTINUED
0006 00
Table 6. Electrical System Troubleshooting Procedures - Continued.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
6.
Solenoid and Starting Motor Operate;
b. Connect meter positive
Engine Cranks Slowly - Continued.
lead to battery positive
terminal
and
meter
negative lead to solenoid
BAT terminal.
c. Place battery disconnect
switch to ON position.
d. Crank engine and observe
If voltage exceeds 0.4 volts,
meter.
clean and tighten cable
connections at batteries, starting
motor and chassis ground points.
GS
MTR
BAT
387-886
8.
Test battery voltage after
cranking load is applied.
a. Set
to
appropriate voltage range.
0006 00-48
Change 1
|