Click here to make tpub.com your Home Page

Page Title: Section Ill. EQUALIZER BAR AND TRACK ROLLER FRAME
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

b. Disassembly. Refer to paragraph 7-2 and
remove the track carrier roller from  support
assembly
c. lnspection and Repair.
(1) Inspect track carrier roller (para 7-2 d).
(2) Inspect carrier roller support for cracks.
breaks, distortion or other damage. Repair minor
cracks by welding (TM 9-237). Replace a damaged
carrier roller support.
d. Installation. Install in reverse order of
removal.
1
Track carrier roller
2
Roll bar
3
Equalizer bar
4
Bolts
5
Support assembly
6
Track carrier roller bracket
Figure 7-36. Preparing to remove support assembly.
Section Ill. EQUALIZER BAR AND TRACK ROLLER FRAME
7-9. Equalizer Bar Inspection
Inspect equalizer bar (2, fig. 7-39) for cracks,
breaks, distortion or other damage. Report any
damage or defects of the equalizer bar to depot
maintenance personnel.
7-10. Track Roller Frame
a. Removal.
(1) Separate the track and lay it out flat (para
(2) Remove sprocket guard and rear track
roller frame guard.
(3) Remove outer hearing cap (fig. 7-37), and
brace bearing cap (fig. 7-38).
(4) Raise and support the front and rear of the
tractor to allow the track rollers to clear the track
rails.
WARNING
Support front of tractor under center of
equalizer bar.
(5) Attach a suitable sling and hoist around
the track carrier rollers, to support the track roller
frame (3, fig. 7-39). The track roller frame weighs
approximately 4350 pounds.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business