Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
BLADE CONTROL LEVER AND LINKAGES REPLACEMENT - CONTINUED
0152 00
CLEANING AND INSPECTION
WARNING
Solvent cleaning compound MIL-PRF-680 Type III is an environmentally compliant and low toxic mate-
rial. However, it may be irritating to the eyes and skin. Use protective gloves and goggles. Use in well-venti-
lated areas. Keep away from open flames and other sources of ignition.
1.
Clean all parts of control linkages with solvent cleaning compound and dry rags.
2.
Inspect all parts and replace any damaged items. Refer to TM 5-2410-233-23P for required replacement parts.
INSTALLATION
1.
Position linkage bracket assembly (17) to machine.
2.
If removed, connect linkage (16) to main (bulldozer) control valve lever located under hydraulic tank (WP 0166 00).
3.
Position linkage (16) to bell crank (14) and install bolt (15).
4.
Position linkage (11) to bell crank (14) and install bolt (13).
5.
Position other end of linkage (11) to control lever (12) and install bolt (10).
6.
Position tilt control linkage (6) to bell crank (9) and install bolt (8) and nut (7).
7.
Position other end of tilt control linkage (6) to tilt control lever (5) and install nut (3), new lockwasher (2) and nut (1).
8.
Perform Adjustment in this work package.
9.
Install floor plates (WP 0135 00).
10.
Check for proper operation of blade controls (TM 5-2410-233-10).
0152 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business