Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
WINCH CONTROL LEVERS AND LINKAGE REPLACEMENT - CONTINUED
0142 00
REMOVAL- CONTINUED
14.
Completely loosen nut (21) on control cable (9) and
22
remove control cable from control valve (22). Repeat
step for other cable.
9
21
386-092
INSTALLATION
NOTE
Both control cable ends are threaded into control valves approximately 1/4 in. (6 mm). Adjustment of cables
is performed later in installation step 10.
1.
Thread end of control cable (9) into control valve (22) and thread nut (21) to control valve. Do NOT tighten nut. Repeat
step for other control cable.
2.
Position cable block (18) and secure with two new lockwashers (20) and capscrews (19).
3.
Install two setscrews (17) in cable block (18) to secure both control cables (9).
4.
Position cable (9) through control bracket (5) and install setscrews (16). Repeat step for other cable.
NOTE
Apply a light coat of clean grease to pin before installation.
5.
Position spacer (15) between both control levers (2).
6.
Install pin (14) and snap ring (13) to secure control levers (2) to control bracket (5).
0142 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business