|
|
TM 5-2410-233-23
TRACK DRIVE SPROCKETS/HUBS REPLACEMENT - CONTINUED
0118 00
INSTALLATION - CONTINUED
26.
Install bearing sleeve (12) in support (5).
27.
Install new seal (11) in support (5) with lip of seal toward and even with outside edge of support. Apply clean oil to lip
of seal.
28.
Apply clean grease on inside diameter of support (5) and install support over holder (17).
29.
Refer to WP 0104 00 for shimming procedure and specifications on sprocket shaft, for correct alignment of sprocket and
track roller frame.
30.
Fill inside of retainer packing (9) with clean grease and install retainer packing on dowels in holder (17).
31.
Install nut (7) on sprocket shaft (8). Tighten nut to 1100-1200 lb-ft (1492-1627 Nm).
32.
Tighten adjusting nut (18) until snug. Final tightening will occur during adjustment.
33.
Install retainer (6) over nut (7) on sprocket shaft (8). Do NOT install new gasket (4) or plate (3) at this time. These com-
ponents need to be removed to perform bearing adjustment.
8
11
12
5
4
769
3
386-276
34.
Adjust final drive bearings (WP 0104 00).
35.
Install track roller frame (WP 0110 00).
36.
Fill final drive (WP 0099 00).
37.
Connect track (WP 0119 00).
38.
Test drive and check track for proper operation (TM 5-2410-233-10).
END OF WORK PACKAGE
0118 00-12
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |