Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
AIR CLEANER MAINTENANCE - CONTINUED
0043 00
INSTALLATION
1.
Install new gasket (8) over studs on air cleaner outlet
7
pipe (7).
8
386-236
2.
Position air cleaner housing (6) with filter body assembly (3) inserted up through opening in hood. Align eight holes in
air cleaner housing with eight studs in air cleaner outlet pipe (7) and slide housing onto studs.
3.
Install two new lockwashers (5) and capscrews (4). Tighten capscrews.
4.
Slide tube (2) onto filter body assembly (3) and tighten hose clamp (1).
3
1
2
3
6
7,8
4,5
386-234
386-113
5.
Install air cleaner filter elements (WP 0042 00).
6.
Run engine and check for proper operation (TM 5-2410-233-10).
END OF WORK PACKAGE
0043 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business