|
|
TM 5-2410-233-23
ENGINE FUMES DISPOSAL HOSE AND TUBE ASSEMBLY REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
Tool kit, general mechanic's (Item 112, WP 0185 00)
Engine OFF and cool (TM 5-2410-233-10)
REMOVAL
1.
Remove capscrew (1) and washer (2) holding clip (3) to timing gear housing (4).
2.
Loosen two hose clamps (5).
3.
Remove hose (6), two hose clamps (5) and engine fumes disposal tube (7) from crankcase breather (8).
INSTALLATION
1.
Install hose (6), two hose clamps (5) and engine fumes disposal tube (7) on crankcase breather (8).
2.
Position hose clamps (5) and tighten.
6
3.
Install clip (3) on timing gear housing (4) with washer
(2) and capscrew (1).
8
5
7
386-098
4
2
1
3
END OF WORK PACKAGE
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |