Click here to make tpub.com your Home Page

Page Title: OSS DISABLES FUNCTIONS (CONT).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-364-34-1
Accumulator testing and charging can expose personnel to high pressure nitrogen. Use of proper safety
equipment is required to prevent serious injury or death.
NOTE
Accumulator can only be accurately charged
when there is 0 psi (0 kPa) present in all
crane hydraulic circuits.
Ensure that all crane control levers are
manually operated to the full up and down
positions. Failure to comply could result in
trapped hydraulic pressure, resulting in
incorrect accumulator charge readings.
PRESSURE TEST
(1) Manually operate all crane control
levers fully up and down.
(2) Remove two screws and guard.
(3) Remove valve stem cap from
accumulator fitting.
(4) Attach accumulator pressure test
hose to accumulator fitting.
(5) Read accumulator charge pressure.
(a) If there is not 190 to 210 psi
(1,310 to 1,448 kPa) present,
recharge accumulator
(Para 16-22).
(b) If there is 190 to 210 psi (1,310
to 1,448 kPa) present, perform
Steps (6) through (8) below, and
go to Step 2 of this Fault.
(6) Remove accumulator pressure test
hose from accumulator fitting.
(7) Install valve stem cap on accumulator
fitting.
(8) Install guard with two screws.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business