Click here to make tpub.com your Home Page

Page Title: CRANE FAILS LOAD TEST. (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-364-34-1
All personnel must stand clear during lifting operations. A swinging or shifting load may cause injury
or death to personnel.
NOTE
Test weight can be 10 lbs (4.5 kg).
(1) Using BOOM control lever, operate
boom until test unit indicates a 15
degree angle (TM 9-2320-364-10).
(2) Using TELE control lever, telescope
boom out completely.
(3) Using HOIST control lever, operate
hoist until hoist hook block is 3.5 ft.
(1 m) above the ground.
(a) If test unit does not indicate
WT = 0, go to Step 12 of this
Fault.
(b) If test unit indicates WT = 0,
go to Step (4) below.
(4) Using BOOM control lever, lower
boom until test unit indicates 5
degrees.
(5) Connect hook block to 3900 lb.
(1771 kg) load.
(6) Using HOIST control lever, lift load
from ground 3 to 4 ft. (91 to 122 cm).
(a) If test unit does not indicate
WT = 3900 (1770 kg), lower load
and go to Step 12 of this Fault.
(b) If test unit indicates WT = 3900
(1770 kg) go to Step 6 of this
Fault.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business