TM 9-2320-364-34-1
All personnel must stand clear during lifting operations. A swinging or shifting load may cause injury or death to personnel.
OPERATION TEST
(1) Attach lifting device to hoist motor.
(2) Remove two screws, lockwashers
and hoist motor from hoist
assembly. Discard lockwashers.
(3) Remove gasket and coupler from
hoist assembly. Discard gasket.
(4) Start engine (TM 9-2320-364-10).
(5) Set WINCH/CRANE switch to
CRANE position.
(6) Set hydraulic selector switch to
CRANE/SRW position.
(7) Set crane POWER switch to
ON position.
(8) Hold HOIST control lever in UP
position.
(a) If hoist motor does not operate,
perform Steps (9) through (14)
below and replace safety relief
valve on hoist motor valve
(Para 16-13).
(b) If hoist motor does operate,
hoist brake is faulty. Perform
Steps (9) through (14) below
and notify supervisor.
(9) Set crane POWER switch to OFF
position.
(10) Set hydraulic selector switch to OFF
position.
(11) Turn OFF ENGINE switch.
(12) Install gasket and coupler on hoist
assembly.
(13) Install hoist motor on hoist assembly
with two screws and lockwashers.
Tighten screws to 75 lb-ft (102 N.m).
(14) Install cover with four screws,
washers, lockwashers and nuts.
|