Click here to make tpub.com your Home Page

Page Title: BOOM CREEPS DOWN. (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-364-34-1
High pressure hydraulics [oil under 3000 psi (20,685 kPa) pressure] operate this equipment. Refer to
vehicle operator and maintenance manuals for hydraulic oil pressure. Never disconnect any hydraulic
line or fitting without first dropping pressure to zero. Failure to comply may result in injury to personnel.
Fuel and oil are slippery and can cause falls. To avoid injury, wipe up spilled fuel or oil with rags.
NOTE
Use a drain pan to catch leaking hydraulic oil.
FLOWMETER TEST
(1) Set crane POWER switch to
OFF position (TM 9-2320-364-10).
(2) Set hydraulic selector switch to OFF
position.
(3) Turn OFF ENGINE switch.
(4) Disconnect flowmeter OUT port
adapter hose from crane hose.
Discard preformed packing.
(5) Install plug with preformed packing
in crane hose.
(6) Tag, mark and disconnect three
hoses from boom lift cylinder on
side of boom without OSS box.
Discard preformed packings.
(7) Install plugs with preformed
packings on disconnected hoses.
(8) Install caps with preformed packings
on two cylinder fittings closest to
four valve bank.
(9) Connect adapter hose with
preformed packing to remaining
fitting on boom lift cylinder.
(10) Start engine.
(11) Set WINCH/CRANE switch to
CRANE position.
(12) Set hydraulic selector switch to
CRANE/SRW position.
(13) Set crane POWER switch to
ON position.
(14) Hook hoist block on ring and take
out slack in cable to prevent boom
from raising.
(15) Hold BOOM lever in UP position.
(a) If more than 0 gpm (0 lpm) are
measured, perform Steps (16)
through (23) below and replace
boom lift cylinder (Para 16-6) on
LHS side of boom.
(b) If 0 gpm (0 lpm) are measured,
perform Steps (16) through (23)
below and replace boom
cylinder (Para 16-6) on cab side
of boom.
Continued on next page.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business