|
|
TM 9-2320-364-34-1
VERIFY REPAIR
(1) Start engine and allow pressure to
build up (TM 9-2320-364-10).
(2) Observe air pressure gage.
(a) If air pressure does build up to
125 4 psi (862 28 kPa) in
5 minutes, fault has been
corrected. Perform Step (3)
below.
(b) If air pressure does not build up to
125 4 psi (862 28 kPa) in 5
minutes, fault not corrected.
Perform Step (3) below and notify
supervisor.
(3) Install right side noise panel
(TM 9-2320-364-20).
2-183
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |