|
|
TM 9-2320-364-20-1
Section II. MAINTENANCE ALLOCATION CHART
(1)
(2)
(3)
(4)
(5)
(6)
Group
Component/
Maintenance
Maintenance Level
Tools
Remarks
Number
Assembly
Function
and
Field
Sustainment
Equipment
Unit
DS
GS
Depot
C
O
F
H
D
01
ENGINE
0100
Engine Assembly:
Engine Assembly
Inspect
0.4
Test
1.0
23, 31, 148
A
Service
1.0
1, 126
Adjust
2.0
5, 6, 79
Replace
21.5
5, 6, 7, 205
B
Repair
44.4
5, 14, 86,
179
D
Overhaul
*
0101
Crankcase, Block,
Cylinder Head:
Cylinder Block
Replace
4.0
Assembly
Repair
3.0
5, 6, 10, 12,
67, 81, 97
117, 133,
166, 187
Cylinder Head
Replace
17.7
5, 6, 41, 62,
Assembly (One)
100, 128
Repair
3.0
5, 6, 10,
29, 64
Cylinder Liner
Replace
1.0
5, 155
C
Repair
2.0
5, 6, 10, 28,
C
67, 68, 87
0102
Crankshaft:
Crankshaft and Main
Replace
6.8
5, 6, 144
Bearing
Repair
*
5, 6, 24, 26
C
Crankcase Front Cover
Inspect
0.2
5, 6, 107
And Oil Seal
Replace
6.5
0103
Flywheel Assembly:
Flexplate Assembly
Replace
25.9
5, 6
B-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |