Click here to make tpub.com your Home Page

Page Title: Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-364-20-1
Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Interval
Item to Be
Procedure
Not Mission
Item
Inspected
Capable If:
No.
125
Biennial
Crane Swing
To check and fill the swing drive gearbox,
Drive Gear
perform the following procedures:
Box
(1) Remove vent cap at top of filler tube.
(2) Check that lubricant is visible at bottom of
tube.
(3) If required, fill gearbox with lubricant.
(4) Replace vent cap.
Check fluid level in swing drive gearbox every
Any Class III leaks are
250 hours of operation or biennially,
found.
whichever comes first. Fill with GO as
required. Refer to Table 2-3.
2-81

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business