Click here to make tpub.com your Home Page

Page Title: Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-364-20-1
Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Interval
Item to Be
Procedure
Not Mission
Item
Inspected
Capable If:
No.
96
Semi-
Material
a. Raise crane boom (1) and extend stages
a. Piston rods are
Annual
Handling
(2) (TM 9-2320-364-10). Check cylinder
scored or bent.
Crane
piston rods (3) for bends and scoring.
b. Check crane boom (1) for deformation,
b. Crane boom is
cracks or broken welds.
deformed, cracked or
has broken welds.
97
Semi-
Boom
Inspect boom chain/cable adjustment. Retract
Clearance is more than
Annual
Chain/Cable
boom and manually push in end of boom
1/32 in. (0.79 mm).
Adjustment
completely back to stops. Pull out on adjusting
nut (1) and check for clearance between
washer (2) and stop plate (3).
2-65

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business