Click here to make tpub.com your Home Page

Page Title: Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-364-20-1
2-9. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
TABLES (CONT).
Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Interval
Item to Be
Procedure
Not Mission
Item
Inspected
Capable If:
No.
88
Semi-
Engine
Check engine compartment wiring for fraying,
Annual
Compartment
splits, missing insulation or poor connections.
Repair if wiring is frayed or split. Refer to
Para 7-101.
89
Semi-
Engine
Remove cab engine access panel and check
Annual
Compartment
alternator mounting and attaching hardware for
looseness and cracks or damage. Replace
alternator mounting or attaching hardware if
damaged or missing. Tighten loose parts.
Refer to Para 7-2 or Para 7-3.
90
Semi-
Engine
Check alternator belts for cracks and frays.
Annual
Compartment
Check for correct belt tension. Replace belts if
damaged or missing. Tighten belts to correct
tension 55 to 65 lbs (245 to 289 N) for 145
amp and 60 to 65 lbs (260 to 289 N) for 200
amp. Refer to Para 7-4 or Para 7-5.
91
Semi-
Fuel System
Check fuel tubes and fittings for leaks. If tubes
Any Class III leaks are
Annual
or fittings are leaking, tighten loose parts.
found.
Refer to Para 4-12.
92
Semi-
Oil Tubes
Check oil tubes and hoses for cracks, fraying,
Tubes or hoses are
Annual
and Hoses
wear or leaks.
damaged.
2-62

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business