Click here to make tpub.com your Home Page

Page Title: Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-364-20-1
Table 2-1. Unit Level Preventive Maintenance Checks and Services (PMCS) (CONT).
Interval
Item to Be
Procedure
Not Mission
Item
Inspected
Capable If:
No.
NOTE
51.1
Semi-
Annual
Air system of truck must be charged
prior to performing the following steps.
Lifting frame must be in stowed
position prior to performing the
following steps.
a. If truck is equipped with Container Handling
Unit (CHU), pull flipper lock pin handle (1)
out and lift air valve lever (2) up to rotate
flipper bracket (3) and flipper bracket lock
plate (4) onto pivot pin (5).
b. Ensure flipper bracket (3) and flipper bracket
lock plate (4) align with and position over
pivot pin (5). If flipper bracket lock plate (4)
does not align with and position over pivot
pin (5), adjust cone weldments (Para 18-13).
c. Pull flipper lock pin handle (1) out and push
air valve lever (2) down to rotate flipper
bracket (3) and flipper bracket lock plate (4)
off of pivot pin (5).
d. Repeat steps (a) through (c) for other side of
truck.
2-22.2
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business