Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-363-20-2
INSTALLATION
1.
SLIDE AIR CYLINDER (4) ONTO MOUNTING RODS (8) AND INSTALL NEW UPPER PUSH NUT (6) AND NEW
LOWER PUSH NUT (7).
2.
CONNECT AIR LINE (3) BY PUSHING AIR LINE INTO COVER RING (5) AS FAR AS IT WILL GO THEN GENTLY
PULL AIR LINE BACK TO LOCK IT IN PLACE.
3.
TEST AIR CYLINDER BY MOVING HEATER/AIR CONDITIONER SLIDE LEVER FROM "DEF" TO "MAX AIR" (TM
9-2320-363-10). ENSURE FLAP WORKS FREELY, HAS FULL MOVEMENT, AND SEALS COMPLETELY.
4.
INSTALL DASH PANEL (2) AND NINE SCREWS (1).
Change 3 4-851.1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business