Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-363-20-2
REAR TIE DOWN AND ROLLER REPLACEMENT (CONT)
INSTALLATION
1.
INSTALL RIGHT TIE DOWN BRACKET (1), SIX WASHERS (2), SIX BOLTS (3), SIX WASHERS (4), AND SIX
NEW LOCK NUTS (5).
2.
INSTALL RIGHT MUD FLAP BRACKET (6), TWO WASHERS (7), TWO BOLTS ( ), TWO WASHERS (9), AND
8
TWO NEW LOCK NUTS (10).
WARNING
Roller weighs 200 lb (91 kg). Attach suitable hoist prior to installation to prevent
possible Injury to personnel.
3.
USING SUITABLE HOIST, SUPPORT AND INSTALL TAIL ROLLER (11).
4.
REPEAT STEPS 1 AND 2 FOR LEFT TIE DOWN BRACKET (12) AND LEFT MUD FLAP BRACKET (13).
5.
INSTALL SCREW (14) AND NEW LOCK NUT (15).
6.
INSTALL TWO LUBRICATION FITTINGS (16) IN TAIL ROLLER (11).
NOTE
Follow-on Maintenance:
Install mud flap assembly (page 4-709).
Lubricate tail roller (Unit PMCS, TM 9-2320-363-20-1).
4-638 Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business