|
|
TM 9-2320-363-20-2
REAR TIE DOWN AND ROLLER REPLACEMENT (CONT)
INSTALLATION
1.
INSTALL RIGHT TIE DOWN BRACKET (1), SIX WASHERS (2), SIX BOLTS (3), SIX WASHERS (4), AND SIX
NEW LOCK NUTS (5).
2.
INSTALL RIGHT MUD FLAP BRACKET (6), TWO WASHERS (7), TWO BOLTS ( ), TWO WASHERS (9), AND
8
TWO NEW LOCK NUTS (10).
WARNING
Roller weighs 200 lb (91 kg). Attach suitable hoist prior to installation to prevent
possible Injury to personnel.
3.
USING SUITABLE HOIST, SUPPORT AND INSTALL TAIL ROLLER (11).
4.
REPEAT STEPS 1 AND 2 FOR LEFT TIE DOWN BRACKET (12) AND LEFT MUD FLAP BRACKET (13).
5.
INSTALL SCREW (14) AND NEW LOCK NUT (15).
6.
INSTALL TWO LUBRICATION FITTINGS (16) IN TAIL ROLLER (11).
NOTE
Follow-on Maintenance:
Install mud flap assembly (page 4-709).
Lubricate tail roller (Unit PMCS, TM 9-2320-363-20-1).
4-638 Change 3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |