| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
ASSEMBLY 
1. 
INSTALL RELIEF VALVE (1). 
2. 
INSTALL GASKET (2) ON COVER (3). 
3. 
INSTALL  PREFORMED  PACKING 
(4) 
ON 
HARNESS CONNECTOR (5). 
4. 
INSERT HARNESS CONNECTOR (5) THROUGH 
HOLE IN COVER (3) AND INSTALL HARNESS 
NUT (6). 
5. 
INSTALL SOLENOID (7) ON EACH SPOOL (8) 
AND REMOVE TAGS 6.  INSTALL SOLENOID 
PROTECTOR (9) ON EACH SOLENOID (7) 7. 
INSTALL METAL GASKET (10) WITH PRINTED 
SIDE UP ON EACH SOLENOID PROTECTOR (9) 
8.  INSTALL NUT (11) WITH BEVELED EDGE 
DOWN ON EACH SPOOL (8). 
9. 
APPLY LOCTITE TO THREADS ON PRESSURE 
TRANSDUCER (12). 
10. 
INSTALL 
PRESSURE 
TRANSDUCER 
(12) 
ENSURING ELECTRICAL CONNECTOR LOCK 
IS ORIENTED OUTWARD.  TORQUE TO 16-20 
LB-FT (22-27 N.m). 
11. 
TUCK SOLENOID WIRES NEXT TO SOLENOIDS 
(7) AND AWAY FROM RELIEF VALVE (1) WHILE 
POSITIONING COVER (3) ON PCU (13). 
12. 
INSTALL COVER (3) AND SIX SCREWS (14). 
TORQUE TO 40-45 LB-IN (4-5 N.m). 
Change 3 4-604.9 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |