Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-363-20-2
INSTALLATION
NOTE
Coat all packings with light coat of engine oil prior to installation.
1.
INSTALL TWO NEW PACKINGS (13 AND 12) ON PURGE PLATE (8).
2.
INSTALL NEW PACKING (11) IN AIR DRYER CANISTER HOUSING (3).
3.
INSTALL NEW CANISTER (10), SPRING (9), PURGE PLATE (8), AND NUT (7). TIGHTEN NUT SECURELY.
4.
INSTALL AIR DRYER CANISTER HOUSING (3) WITH ELBOW FACING AS NOTED IN REMOVAL, STEP 3.
5.
INSTALL CLAMP (6) AND TIGHTEN LOCK NUT (5) ON AIR DRYER CANISTER HOUSING (3).
6.
CONNECT AIR LINE (4) TO AIR DRYER CANISTER HOUSING (3).
7.
CONNECT CONNECTOR (2) TO AIR DRYER CANISTER HOUSING (3) AND INSTALL TIE STRAP (1).
NOTE
Follow-on Maintenance:
Connect batteries (page 2-29).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business