Click here to make tpub.com your Home Page

Page Title: INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-363-20-2
WARNING
Make sure all air lines and fittings are clear of debris.  Make sure excess pipe sealant
compound does not enter air lines or fittings. Failure to do so could result in equipment
failure and/or injury to personnel.
Sealant compounds can burn easily, can give off harmful vapors, and are harmful to skin
and clothing. To avoid injury or death, keep away from open fire and use in well-ventilated
area. If sealant compound gets on skin or clothing, wash immediately with soap and water.
NOTE
Perform steps 1 thru 3 only if fittings have been removed from air tank.
1.
COAT PIPE THREADS OF TWO NEW PLUGS (1), NEW DRAIN VALVE (2), NEW CHECK VALVE (3), AND TWO
NEW ELBOWS (4) WITH PIPE SEALANT COMPOUND.
2.
INSTALL TWO PLUGS (1), DRAIN VALVE (2), CHECK VALVE (3), AND TWO ELBOWS (4) IN NEW AIR TANK
(5).
3.
INSTALL TWO MOUNTING BRACKETS (6), TWO SCREWS (7), AND TWO NUTS (8).
4.
INSTALL AIR TANK (5), FOUR WASHERS (9), AND FOUR NUTS (10).
5.
CONNECT TWO TUBES (11) TO AIR TANK (5).
NOTE
Follow-on Maintenance:
Install rear platform (page 4-734).
Perform standard leak test (page 2-24).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business