|
|
TM 9-2320-363-20-2
8.
INSTALL TWO CLAMPS (21), TWO WASHERS (22), AND TW O NEW LOCK NUTS (23) ON FRAME RAIL (24).
9.
INSTALL HOSE (25), PIPE (26), AND TWO CLAMPS (27) ON TRANSMISSION OIL COOLER (8).
10.
INSTALL HOSE (28) AND TWO CLAMPS (29) BETWEEN THERMOSTAT HOUSING (30) AND PIPE (26).
11.
INSTALL HOSE (31) AND TWO CLAMPS (32) BETWEEN TRANSMISSION OIL COOLER (8) AND RADIATOR
(33).
12.
INSTALL HOSE (34), PIPE (35), AND TWO CLAMPS (36) ON WATER PUMP (37).
13.
INSTALL HOSE ELBOW (38) AND TWO CLAMPS (39) BETWEEN TRANSMISSION OIL COOLER (8) AND PIPE
(35).
14.
INSTA LL CLAMP (40), TWO WASHERS (41), SCREW (42), AND NEW LOCK NUT (43).
NOTE
Follow-on Maintenance:
Fill cooling system (Unit PMCS, TM 9-2320-363-20-1).
Add transmission fluid (Unit PMCS, TM 9-2320-363-20-1).
Install transmission tunnel access cover (pag e 4-752 or 4-756.1).
Change 3 4-363
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |