| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
NOTE 
Step 2 is for M915A2 only. 
2. 
INSTALL TWO MOUNTING BRACKETS (1), BRACKET (2), EIGHT WASHERS (4), EIGHT SCREWS (5), EIGHT 
WASHERS (6), AND EIGHT NUTS (7). 
3. 
INSTALL TWO BRACKETS (8), TWO SCREWS (9), AND TWO NEW KEP NUTS (10) ON BATTERY BOX (11). 
4. 
INSTALL TWO LATCHES (12), TWO SCREWS (13), AND TWO NEW LOCK NUTS (14). 
5. 
USING SUITABLE JACK, INSTALL BATTERY BOX (11), TWO BRACKETS (15), SIX WASHERS (16), SIX 
SCREWS (17), SIX WASHERS (18), AND SIX NUTS (19). 
6. 
INSTALL CLAMP (20), WASHER (21), SCREW (22), WASHER (23), AND LOCK NUT (24) ON BATTERY BOX 
(11). 
NOTE 
Follow-on Maintenance: 
Install left step (page 4-624). 
Install NATO slave receptacle (page 4-270). 
Install batteries (page 4-254). 
Install secon dary air tank (all except M915A2) (page 4-474). 
Change 3 4-261 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |