|
|
TM 9-2320-363-20-2
CLEANING/INSPECTION
Clean and inspect all parts in accordance with Chapter 2.
INSTALLATION
1.
COAT THREADS OF SENSOR (5) WITH PIPE SEALING COMPOUND.
2.
INSTALL SENSOR (5) IN THERMOSTAT HOUSING (6).
3.
CONNECT WIRE (4) AND INSTALL WASHER (3), NEW LOCK WASHER (2), AND NUT (1) ON SENSOR (5).
NOTE
Follow-on Maintenance:
Fill cooling system (Unit PMCS, TM 9-2320-363-20-1).
Connect batteries (page 2-29)
Change 3 4-239
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |