|
|
TM 9-2320-363-20-2
CLEANING/INSPECTION
Clean and inspect all parts in accordance with Chapter 2.
INSTALLATION
1.
COAT SENSOR (4) WITH PIPE SEALING COMPOUND AND INSTALL IN THERMOSTAT HOUSING (5).
2.
CONNECT TWO WIRES (3) AND INSTALL TWO NEW LOCK WASHERS (2) AND TWO SCREWS (1) IN
SENSOR (4).
NOTE
Follow-on Maintenance:
Fill radiator (Unit PMCS, TM 9-2320-363-20-1).
Connect batteries (page 2-29).
Change 3 4-237
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |