| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
LEFT GAGE PANEL AND LAMPS REPLACEMENT 
This task covers: 
a. Removal 
b. Cleaning/Inspection 
c. Installation 
INITIAL SETUP 
Tools and Special Equipment: 
Equipment Condition: 
Shop Equipment, SC 4910-95-CL-A72 
Reference Condition Description 
Tool Kit, SC 5180-90-CL-N26 
Page 2-28 
Air System Drained 
Materials/Parts: 
Page 2-29 
Batteries Disconnected 
Nut, Lock (8) 
Tags, Identification Appendix C, Item 26 
REMOVAL 
1. 
REMOVE FOUR SCREWS (1) AND PULL PANEL (2) AWAY FROM DASHBOARD. 
NOTE 
Tag all plugs and tubes prior to removal to aid in installation. 
2. 
DISCONNECT TWO PLUGS (3), CONNECTOR (4), AND TWO TUBES (5) AND REMOVE PANEL (2). 
NOTE 
On all except M915A2 and M916A1, left gage panel has only three gages. 
3. 
REMOVE LAMP HOLDERS (6) FROM ENGINE OIL PRESSURE GA GE (7), ENGINE WATER TEMPERATURE 
GAGE (8), VOLTMETER (9), AND TURBO-BOOST GAGE (10). 
NOTE 
Note location of each gage prior to removal to aid in installation. 
4. 
REMOVE TWO LOCK NUTS (11), BRACKET (12), AND ENGINE OIL PRESSURE GAGE (7) FROM PANEL (2). 
DISCARD LOCK NUTS. 
5. 
REPEAT STEP 4 FOR ENGINE WATER TEMPERATURE GAGE (8), VOLTMETER (9), AND TURBO-BOOST 
GAGE (10). 
6. 
REMOVE AIR VENT (13) FROM PANEL (2). 
7. 
TURN FOUR LAMPS (14) TO LEFT AND REMOVE FROM FOUR LAMP HOLDERS (6). 
CLEANING/INSPECTION 
Clean and inspect all parts in accordance with Chapter 2. 
4-172 Change 3 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |