Click here to make tpub.com your Home Page

Page Title: LEFT GAGE PANEL AND LAMPS REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-363-20-2
LEFT GAGE PANEL AND LAMPS REPLACEMENT
This task covers:
a. Removal
b. Cleaning/Inspection
c. Installation
INITIAL SETUP
Tools and Special Equipment:
Equipment Condition:
Shop Equipment, SC 4910-95-CL-A72
Reference Condition Description
Tool Kit, SC 5180-90-CL-N26
Page 2-28
Air System Drained
Materials/Parts:
Page 2-29
Batteries Disconnected
Nut, Lock (8)
Tags, Identification Appendix C, Item 26
REMOVAL
1.
REMOVE FOUR SCREWS (1) AND PULL PANEL (2) AWAY FROM DASHBOARD.
NOTE
Tag all plugs and tubes prior to removal to aid in installation.
2.
DISCONNECT TWO PLUGS (3), CONNECTOR (4), AND TWO TUBES (5) AND REMOVE PANEL (2).
NOTE
On all except M915A2 and M916A1, left gage panel has only three gages.
3.
REMOVE LAMP HOLDERS (6) FROM ENGINE OIL PRESSURE GA GE (7), ENGINE WATER TEMPERATURE
GAGE (8), VOLTMETER (9), AND TURBO-BOOST GAGE (10).
NOTE
Note location of each gage prior to removal to aid in installation.
4.
REMOVE TWO LOCK NUTS (11), BRACKET (12), AND ENGINE OIL PRESSURE GAGE (7) FROM PANEL (2).
DISCARD LOCK NUTS.
5.
REPEAT STEP 4 FOR ENGINE WATER TEMPERATURE GAGE (8), VOLTMETER (9), AND TURBO-BOOST
GAGE (10).
6.
REMOVE AIR VENT (13) FROM PANEL (2).
7.
TURN FOUR LAMPS (14) TO LEFT AND REMOVE FROM FOUR LAMP HOLDERS (6).
CLEANING/INSPECTION
Clean and inspect all parts in accordance with Chapter 2.
4-172 Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business