| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
RIGHT GAGE PANEL AND LAMPS REPLACEMENT 
This task covers: 
a. Removal 
b. Cleaning/Inspection 
c. Installation 
INITIAL SETUP 
Applicable Configuration: 
Materials/Parts: 
All except M915A2 and M916A1 
Nut, Lock (4) 
Tags, Identification Appendix C, Item 26 
Tools and Special Equipment: 
Equipment Condition: 
Shop Equipment, SC 4910-95-CL-A72 
Tool Kit, SC 5180-90-CL-N26 
Reference 
Condition Description 
Page 2-28 
Air System Drained 
Page 2-29 
Batteries Disconnected 
REMOVAL 
1. 
REMOVE FOUR SCREWS (1) AND PULL PANEL (2) AWAY FROM DASHBOARD. 
NOTE 
Tag all air tubes, connectors, and gages prior to removal to aid in installation. 
2. 
DISCONNECT CONNECTOR (3) FROM CAB WIRING HARNESS CONNECTOR (4). 
3. 
DISCONNECT CONNECTORS (5) FROM FUEL LEVEL GAGE (6), TRANSMISSION OIL TEMPERATURE GAGE 
(7), AND TRANSFER CASE OIL TEMPERATURE GAGE (8). 
4. 
DISCONNECT TWO TUBES (9) FROM AIR PRE SSURE GAGES (10). 
DISCONNECT TUBE (11) FROM AIR 
CLEANER RESTRICTION INDICATOR GAGE (12). 
5. 
REMOVE PANEL (2) FROM DASHBOARD. 
6. 
REMOVE LAMP HOLDERS (13) FROM FUEL LEVEL GAGE (6), TRANSMISSION OIL TEMPERATURE GAGE 
(7), TRANSFER CASE OIL TEMPERATURE GAGE (8), AND TWO AIR PRESSURE GAGES (10). 
7. 
REMOVE FOUR LOCK NUTS (14), GROUND WIRE (15), TWO BRACKETS (16), AND AIR PRESSURE GAGES 
(10) FROM PANEL (2). DISCARD LOCK NUTS. 
8. 
REMOVE SIX NUTS (17), WASHERS (18), THREE BRACKETS (19), FUEL LEVEL GAGE (6), TRANSMISSION 
OIL TEMPERATURE GAGE (7), AND TRANSFER CASE OIL TEMPERATURE GAGE (8) FROM PANEL (2). 
9. 
REMOVE TWO SCREWS (20) AND AIR CLEANER RESTRICTION INDICATOR GAGE (12) FROM PANEL (2). 
10. 
TURN FIVE LAMPS (21) TO LEFT AND REMOVE FROM LAMP HOLDERS (13). 
4-171.0 Change 3 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |