|
|
TM 9-2320-363-20-2
RIGHT GAGE PANEL AND LAMPS REPLACEMENT
This task covers:
a. Removal
b. Cleaning/Inspection
c. Installation
INITIAL SETUP
Applicable Configuration:
Materials/Parts:
M915A2 and M916A1
Nut, Lock (4)
Equipment Condition:
Tools and Special Equipment:
Reference
Condition Description
Shop Equipment, SC 4910-95-CL-A72
Tool Kit, SC 5180-90-CL-N26
Page 2-28
Air System Drained
Page 2-29
Batteries Disconnected
REMOVAL
1.
REMOVE FOUR SCREWS (1) AND PULL PANEL (2) AWAY FROM DASHBOARD.
2.
DISCONNECT PLUG (3) FROM BLACKOUT LIGHT SWITCH (4).
3.
DISCONNECT CONNECTOR (5).
NOTE
Tag air tubes prior to removal to aid in installation.
4.
DISCONNECT TWO AIR TUBES (6) FROM TWO AIR PRESSURE GAGES (7 AND 8) AND REMOVE PANEL (2).
5.
REMOVE THREE SCREWS (9), THREE KNOBS (10), AND THREE WASHERS (11) FROM BLACKOUT LIGHT
SWITCH (4).
6.
REMOVE FOUR NUTS (12), FOUR SCREWS (13), AND BLACKOUT LIGHT SWITCH (4) FROM PANEL (2).
7.
REMOVE LAMP HOLDER (14), TWO LOCK NUTS (15), WIRE (16), BRACKET (17), AND AIR PRESSURE GAGE
(7) FROM PANEL (2). DISCARD LOCK NUTS.
8.
REMOVE LAMP HOLDE R (14), TWO LOCK NUTS (15), BRACKET (17), AND AIR PRESSURE GAGE (8) FROM
PANEL (2). DISCARD LOCK NUTS.
9.
TURN TWO LAMPS (18) TO LEFT AND REMOVE FROM TWO LAMP HOLDERS (14).
CLEANING/INSPECTION
Clean and inspect all parts in accordance with Chapter 2.
INSTALLATION
1.
INSTALL TWO LAMPS (18) IN TWO LAMP HOLDERS (14) AND TURN TO RIGHT.
4-170 Change 3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |