|
|
TM 9-2320-363-20-2
3.
TIGHTEN NUT (5).
4.
TIGHTEN CAPSCREW (3).
5.
TORQUE CAPSCREW (2) AND CAPSCREW (3) TO 60 -70 FT-LB (81-95 N.m).
6.
CONNECT BATTERIES (PAGE 2-29).
7.
OPERATE ENGINE FOR ABOUT 30 MINUTES (OR 15 MILES), THEN CHECK BELT TENSION. CHECK AGAIN
AFTER 8 HOURS (OR 250 MILES). ADJUST BELT TENSION AS NEEDED.
Change 3 4-155.1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |