| ||||||||||
| 
 
  | 
![]() TM 9-2320-363-20-2 
INSTALLATION 
INSTALL ALTERNATOR BELT (4). 
ADJUSTMENT 
1. 
BACK OFF NUT (1) AND USING TENSIOMETER (5), TIGHTEN NUT (2) UNTIL ALTERNATOR BELT TENSION 
IS 60-80 LBS (267-356 N). 
2. 
TIGHTEN NUT (3) AND NUT (1). 
3. 
CONNECT BATTERIES (PAGE 2-29). 
4. 
OPERATE ENGINE FOR ABOUT 30 MINUTES (OR 15 MILES), THEN CHECK BELT TENSION. CHECK AGAIN 
AFTER 8 HOURS (OR 250 MILES). ADJUST BELT TENSION AS NEEDED. 
Change 3 4-155 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |