|
|
TM 9-2320-363-20-2
INSTALLATION
1.
INSTALL VENT (19), TWO ELBOWS (18), NIPPLE (17), AND FILTER (16) ON SOLENOID (3).
2.
INSTALL CLAMP (15), BRACKET (11), WASHER (14), SCREW (13), AND NEW LOCK NUT (12) ON SOLENOID
(3).
3.
INSTALL SOLENOID (3), WASHER (10), WIRE (9), AND NUT (8).
4.
INSTALL WIRE (6), NEW LOCK WASHER (5), AND SCREW (4) ON TEMPERATURE SENDING UNIT (7).
5.
CONNECT TWO TUBES (2 AND 1) TO SOLENOID (3).
NOTE
Follow-on Maintenance:
Connect batteries (page 2-29).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |