| ||||||||||
| 
 
  | 
![]() TM 9-2320-360-34-2 
(21) Install new preformed packing (17) on case 
drain plug (18). 
(22) Install case drain plug (18) in valve housing (19). 
Torque to 40-60 lb-in. (4.5-6.8 N m). 
(23) Install springs (20 and 21) in control spool (22). 
NOTE 
Valve housing should be positioned 
with opening facing you. 
(24) Install control spool (22) with springs (20 and 21) 
in right port of valve housing (19). 
(25) Install new preformed packing (23) on control 
spool plug (24). 
(26) Install control spool plug (24) in valve housing 
(19). 
(27) Install new preformed packing (25) on control 
spool plug (26). 
NOTE 
Compress springs to install second 
plug. 
(28) Install control spool plug (26) in valve housing 
(19). 
(29) Tighten control spool plugs (24 and 26) to 38-46 
lb-ft (51-62 Nm). 
(30) Install three new preformed packings (27) and 
four new backup rings (28) on balance ring (29). 
NOTE 
Balance ring springs may be installed 
in any two holes that are directly 
across from each other. 
(31) Install two balance ring springs (30) in holes in 
valve housing (19). 
(32) Coat preformed packings (27) and backup rings 
(28) with petroleum jelly. 
NOTE 
Ensure two index pins are properly 
seated  in  balance  ring  before 
installation. 
(33) Align two index pins with two remaining holes in 
valve housing (19) and install balance ring (29). 
Push balance ring (29) into valve housing (19) 
until it just touches springs (30). 
28-37 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |