Click here to make tpub.com your Home Page

Page Title: FORWARD CLUTCH AND TURBINE SHAFT REPAIR (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-34-2
22-8.
FORWARD CLUTCH AND TURBINE SHAFT REPAIR (CONT)
e. Installation
(1) Install two new seal rings (1) on turbine shaft (2).
(2) Install outer race (3), roller bearing (4), and inner
race  (5)  on  fifth  clutch  assembly  (6)  in
transmission housing (7).
(3) Install fifth clutch alignment fixture (8) on fifth
clutch assembly (6).
WARNING
Compressed air used to lockup fifth
clutch plate will not exceed 30 psi
(207 kPa).  Use only with effective
chip
guarding
and
personal
protective
equipment
(goggles/
shield, gloves, etc.).
(4) Apply air pressure to port (9) to lock up fifth
clutch plates.
(5) Remove fifth clutch alignment fixture (8) and
install  forward  clutch  assembly  (6)  in
transmission housing (7) using lifting tool (10)
while assistant holds air pressure in fifth clutch
assembly (6).
(6) Have assistant stop air pressure when forward
clutch  assembly  (2)  is  fully  seated  in
transmission housing (7).
f. Follow-On Maintenance
(1) Install torque converter housing (para 22-7).
(2) Install main control valve body (para 22-14).
22-46

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business