|
|
TM 9-2320-360-34-2
22-5. TORQUE CONVERTER STATOR REPAIR
This task covers:
a. Removal
d.
Assembly
b. Disassembly
e.
Installation
c. Cleaning/Inspection
f.
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Materials/Parts
Flywheel assembly removed (para 22-4).
Oil, Lubricating (Item 44, Appendix B)
Solvent, Dry Cleaning (Item 54, Appendix B)
Tools and Special Tools
Tool Kit, Genl Mech (Item 202, Appendix E)
Compressor Unit, Air (Item 24, Appendix E)
Goggles, Industrial (Item 57, Appendix E)
Holder, Stator Roller (Item 70, Appendix E)
a.
Removal
NOTE
Bearings, springs, and roller race
may fall out when stator is removed.
Remove stator (1) from torque converter pump
(2) and shaft (3).
b.
Disassembly
(1) Hold rim of stator (1) on work surface.
(2) Turning roller race (2) clockwise, slowly
remove from stator (1).
(3) Remove 10 roller springs (3) and 10
rollers (4) from stator (1).
(4) Remove thrust bearing (5) and thrust
bearing race (6) from stator (1).
22-17
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |