|
|
TM 9-2320-360-34-2
(2)
Turn flywheel assembly (2) over so
bracket (1) faces down.
(3)
Soak clutch plate (4) in lubricating oil for 3
minutes and install on flywheel (2).
(4)
Align notches with keys (5) and install
backplate (6) in flywheel (2).
CAUTION
Gear on torque converter turbine
must be lined up with teeth of lockup
clutch plate.
Damage to lockup
clutch may result.
(5)
Install torque converter turbine (7) on
flywheel (2).
(6)
Coat new seal ring (8) with lubricating oil
and install on turbine shaft (9).
(7)
Coat new seal ring (10) with lubricating oil
and install on torque converter pump (11).
CAUTION
Support torque converter turbine
during installation.
Damage to
equipment may result.
(8)
Hold torque converter turbine (7) on
flywheel assembly (2) while assistant
operates lifting device. Position flywheel
assembly (2) on torque converter pump
(11) and align holes.
22-15
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |