|
|
TM 9-2320-360-34-2
19-10. PISTON, CONNECTING ROD, AND LINER REPAIR (CONT)
(19) Install cap (18) and new bearing shell (19)
over two studs (21).
(20) Install two nuts (17) on two studs (21).
Torque to 60-70 lb-ft (81-95 Nm).
NOTE
Hold down clamps are installed over
each piston and liner.
(21) Install hold down clamp (8) over cylinder
liner (4) with two screws (9).
(22) Repeat steps (5) thru (21) for remaining
pistons (12) and liners (4).
(23) After all liners and pistons have been
installed, remove screws (9) and hold
down clamps (8).
(24) Check that clearance between each
connecting rod attached to same
crankshaft journal is 0.008-0.016 in. (0.2-
0.4 mm) using feeler gage (22).
19-94
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |