|
|
TM 9-2320-360-34-2
e. Follow-On Maintenance
(1) Install main bearings and crankshaft (para 19-8).
(2) Install pistons, connecting rods, and liners (para 19-10).
(3) Install front end plate (para 19-5).
(4) Install rear end plate (para 19-6).
(5) Install idler gear (para 19-13).
(6) Install camshafts and end bearings (para 19-12).
(7) Install blower drive support (para 4-8).
(8) Install flywheel housing (para 19-9).
(9) Install flexplate assembly (para 3-17).
(10) Install engine block breather tube (para 3-6).
(11) Install crankshaft cover, front oil seal, and oil pump (para 19-14).
(12) Install oil pressure relief valve (para 3-21).
(13) Install oil pressure regulator valve (para 3-22).
(14) Install oil pan (para 3-20).
(15) Install cylinder heads (para 3-10).
(16) Install SRSITRS sensor (para 3-7).
(17) Install injectors (para 4-2).
(18) Install rocker arms (para 3-18).
(19) Install engine brake retarders (para 3-26).
(20) Install engine brake retarder wire harnesses (para 6-16).
(21) Install aftercooler (para 5-7).
(22) Install blower (para 4-6).
(23) Install tachometer drive gear (para 3-25).
(24) Install blower accessory drive hub (para 4-9).
(25) Install fuel supply pump (para 4-4).
(26) Install air inlet adapter (para 4-5).
(27) Install turbocharger (para 4-11).
(28) Install crankshaft vibration damper (para 3-14).
(29) Install crankshaft pulley (para 3-12).
(30) Install water pump drive gear (para 3-24).
(31) Install vibration damper and front cover (para 3-15).
(32) Install water pump (para 5-5).
(33) Install secondary fuel filter head (para 4-13).
(34) Install right thermostat housing (para 5-4).
(35) Install left thermostat housing (para 5-3).
(36) Install oil cooler and housing (para 3-19).
(37) Adjust valve clearance, engine brake retarder, and fuel injector timing (para 3-27).
19-25
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |