Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2320-360-34-1 NOTE ECB   must   be   slid   back   to   create opening to gain access to locknut. (33) Install  six  ground  wires  no.  1435  (62)  on doghouse  (61)  with  screw  (63)  and  new locknut (64). WARNING Adhesive  causes  immediate  bonding on contact with eyes, skin, or clothing   and   also   gives   off   harmful vapors.  Wear protective goggles and use     in     well-ventilated     area.          If adhesive   gets   in   eyes,   try   to   keep eyes  open,  flush  eyes  with  water  for 15 minutes and get immediate medical attention. NOTE The four 2 in. (5 cm) screws are used to retain the top doghouse insulation. These    screws    must    be    placed    in locations marked during removal. (34) Coat   threads   of   four   screws   (64.1)   with four adhesive-sealant. (34.1) Install   ECB   (54)   and   two   clips   (65)   on doghouse    (61)    with    eight    screws    (66), screws (64.1) and washers (64.2). NOTE DDEC    circuit    breakers    should    be positioned in locations marked during removal. (35) Install  two  DDEC  circuit  breakers  (67)  in ECB (60) with two nuts (68). (36) Install   three   harness   connectors   (69)   in sockets (70).  Tighten three screws (71). Change 2  13-37

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business